Project Details

This page displays current information for project DEA: 120K0224.

Project Information

Project IdentifiersProject ID: 213750
DEA: 120K0224
EFIS: 1214000097
DIST-CO-RTE-PM12-ORA-5-14.5/17.1
Award Date03/05/2019
Closeout DateNot set
Work DescriptionSouth County Improvement Project (Phase 2 - Oso/Alicia) CONST BRIDGES, RW, SW, HMA PVMT, JPCP, DRAINAGE, AND ELECT SYSTEMS.
Location DescriptionORANGE COUNTY IN MISSION VIEJO AND LAGUNA HILLS FROM 0.7 MILE SOUTH OF OSO PARKWAY OVERCROSSING TO 0.3 MILE SOUTH OF ALICIA PARKWAY OVERCROSSING
QA Service Level1 (Verified on 04/15/2019)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
steven.kim@dot.ca.govSteven KimResident EngineerCaltrans RE DB
sara.soleimani@dot.ca.govSara SoleimaniStructural RepresentativeCaltrans SR DB
keivan.hassan@dot.ca.govKeivan HassanMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 61-70 of 128 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2022-12-15-112/15/202212/19/2022AuthorizationSMTL TM7 - Epoxy Coated DowelsView
2022-10-21-4210/21/202210/31/2022Quality AssuranceSMTL TM5 - CouplersView
2022-10-21-4110/21/202210/31/2022Quality AssuranceSMTL TM5 - CouplersView
2022-10-28-110/28/202210/28/2022Quality AssuranceConcreteView
2022-07-20-107/20/202207/25/2022Quality AssuranceSMTL TM5 - Welded HoopsView
2022-02-10-202/10/2022Quality ControlSMTL TM5 - Welded HoopsView
2022-02-10-102/10/202202/15/2022Quality AssuranceSMTL TM5 - Welded HoopsView
2022-01-13-401/13/2022Quality ControlSMTL TM5 - Headed BarsView
2022-01-13-201/13/202202/01/2022Quality AssuranceSMTL TM5 - Headed BarsView
2021-10-16-1010/16/202112/23/2021Quality AssuranceSMTL TM5 - CouplersView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods