Project Details

This page displays current information for project DEA: 080Q75U4.

Project Information

Project IdentifiersProject ID: 213746
DEA: 080Q75U4
EFIS: 0817000114
DIST-CO-RTE-PM08-SBD,RIV-60-R4.6/R9.9, R0.0/12.2
Award Date04/18/2019
Closeout Date06/28/2022
Work DescriptionREPLACEMENT OF TWO OUTSIDE LANES AND CONCRETE SLABS
Location DescriptionNot set
QA Service Level1 (Verified on 06/17/2019)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
mujahid.qureshi@dot.ca.govMujahid QureshiResident EngineerCaltrans RE DB
ching.chuang@dot.ca.govChing ChuangStructural RepresentativeCaltrans SR DB

Samples

Samples submitted for this project.

Displaying 81-90 of 966 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2021-05-13-905/13/202105/13/2021VerificationAggregateView
2021-05-18-1905/18/202105/20/2021VerificationAggregateView
2021-05-12-4105/12/202105/13/2021Department AcceptanceAggregateView
2021-05-12-4205/12/202105/13/2021Department AcceptanceAggregateView
2021-05-14-1505/14/202105/15/2021Department AcceptanceAggregateView
2021-05-14-1605/14/202105/15/2021Department AcceptanceAggregateView
2021-05-17-1405/17/202105/18/2021Department AcceptanceAggregateView
2021-05-17-1505/17/202105/18/2021Department AcceptanceAggregateView
2021-05-18-2105/18/202105/19/2021Department AcceptanceAggregateView
2021-05-18-2205/18/202105/19/2021Department AcceptanceAggregateView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods