Project Details
This page displays current information for project DEA: 080Q75U4.
Project Information
Project Identifiers | Project ID: 213746 DEA: 080Q75U4 EFIS: 0817000114 |
---|---|
DIST-CO-RTE-PM | 08-SBD,RIV-60-R4.6/R9.9, R0.0/12.2 |
Award Date | 04/18/2019 |
Closeout Date | 06/28/2022 |
Work Description | REPLACEMENT OF TWO OUTSIDE LANES AND CONCRETE SLABS |
Location Description | Not set |
QA Service Level | 1 (Verified on 06/17/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
mujahid.qureshi@dot.ca.gov | Mujahid Qureshi | Resident Engineer | Caltrans RE DB |
ching.chuang@dot.ca.gov | Ching Chuang | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 81-90 of 966 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-05-01-3 | 05/01/2021 | 05/05/2021 | Verification | Aggregate | View |
2021-04-20-22 | 04/20/2021 | 04/21/2021 | Department Acceptance | Concrete | View |
2021-05-01-2 | 05/01/2021 | 05/04/2021 | Verification | Aggregate | View |
2021-04-21-20 | 04/21/2021 | 04/22/2021 | Department Acceptance | Concrete | View |
2021-04-27-16 | 04/27/2021 | 04/30/2021 | Quality Assurance | Concrete | View |
2021-04-26-16 | 04/26/2021 | 04/30/2021 | Quality Assurance | Concrete | View |
2021-04-23-7 | 04/23/2021 | 04/26/2021 | Quality Assurance | Concrete | View |
2021-04-17-4 | 04/17/2021 | 04/18/2021 | Department Acceptance | Concrete | View |
2021-04-16-19 | 04/16/2021 | 04/17/2021 | Department Acceptance | Concrete | View |
2021-04-22-11 | 04/22/2021 | 04/26/2021 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods