Project Details
This page displays current information for project DEA: 080P3904.
Project Information
Project Identifiers | Project ID: 213744 DEA: 080P3904 EFIS: 0800001025 |
---|---|
DIST-CO-RTE-PM | 08-SBD-18-101.5/115.9 |
Award Date | 02/01/2019 |
Closeout Date | 08/16/2023 |
Work Description | WIDEN EXISTING SHOULDER TO 8' AND CONSTRUCT SHOULDER RUMBLE STRIPS |
Location Description | SAN BERNARDINO COUNTY FROM 0.5 MILE WEST OF ROUTE 395 TO 263 RD STREET. |
QA Service Level | 1 (Verified on 05/30/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
john.santos@dot.ca.gov | John Santos | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 42 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2020-02-21-1 | 02/21/2020 | 02/24/2020 | Acceptance | Hot Mix Asphalt | View |
2020-02-20-5 | 02/20/2020 | 02/20/2020 | Acceptance | Hot Mix Asphalt | View |
2020-02-19-5 | 02/19/2020 | 02/20/2020 | Acceptance | Hot Mix Asphalt | View |
2020-02-18-3 | 02/18/2020 | 02/19/2020 | Acceptance | Hot Mix Asphalt | View |
2020-02-14-7 | 02/14/2020 | 02/18/2020 | Acceptance | Hot Mix Asphalt | View |
2020-02-13-14 | 02/13/2020 | 02/14/2020 | Acceptance | Hot Mix Asphalt | View |
2020-02-12-8 | 02/12/2020 | 02/13/2020 | Acceptance | Hot Mix Asphalt | View |
2020-02-11-10 | 02/11/2020 | 02/12/2020 | Acceptance | Hot Mix Asphalt | View |
2020-02-07-12 | 02/07/2020 | 02/07/2020 | Acceptance | Hot Mix Asphalt | View |
2020-02-06-11 | 02/06/2020 | 02/07/2020 | Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods