Project Details
This page displays current information for project DEA: 081C38U4.
Project Information
Project Identifiers | Project ID: 213707 DEA: 081C38U4 EFIS: 0817000196 |
---|---|
DIST-CO-RTE-PM | 08-RIV-10-6.7/R25.1 |
Award Date | 11/26/2019 |
Closeout Date | 11/01/2023 |
Work Description | Remove concrete pavement and base, and place HMA and JPCP |
Location Description | ROUTE 10/60 SEPARATION IN BEAUMONT TO ROUTE 10/111 SEPARATION NEAR CABAZON. |
QA Service Level | 1 (Verified on 01/09/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
elvira.lenart@dot.ca.gov | Elvira Lenart | Resident Engineer | Caltrans RE DB |
joshua.fry@dot.ca.gov | Joshua Fry | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1321-1330 of 1400 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-10-06-70 | 10/06/2022 | 10/07/2022 | Quality Assurance | Concrete | View |
2022-10-26-52 | 10/26/2022 | 10/27/2022 | Quality Assurance | Concrete | View |
2022-10-27-45 | 10/27/2022 | 10/28/2022 | Quality Assurance | Concrete | View |
2022-11-01-61 | 11/01/2022 | 11/07/2022 | Quality Assurance | Hot Mix Asphalt | View |
2022-10-29-5 | 10/29/2022 | 10/30/2022 | Quality Assurance | Concrete | View |
2022-11-14-40 | 11/14/2022 | 10/17/2022 | Quality Assurance | Hot Mix Asphalt | View |
2022-11-15-37 | 11/15/2022 | 10/17/2022 | Quality Assurance | Hot Mix Asphalt | View |
2022-10-21-54 | 10/21/2022 | 11/17/2022 | Quality Assurance | Hot Mix Asphalt | View |
2022-11-05-11 | 11/05/2022 | 11/06/2022 | Quality Assurance | Concrete | View |
2022-10-31-55 | 10/31/2022 | 11/01/2022 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods