Project Details
This page displays current information for project DEA: 081C38U4.
Project Information
Project Identifiers | Project ID: 213707 DEA: 081C38U4 EFIS: 0817000196 |
---|---|
DIST-CO-RTE-PM | 08-RIV-10-6.7/R25.1 |
Award Date | 11/26/2019 |
Closeout Date | 11/01/2023 |
Work Description | Remove concrete pavement and base, and place HMA and JPCP |
Location Description | ROUTE 10/60 SEPARATION IN BEAUMONT TO ROUTE 10/111 SEPARATION NEAR CABAZON. |
QA Service Level | 1 (Verified on 01/09/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
elvira.lenart@dot.ca.gov | Elvira Lenart | Resident Engineer | Caltrans RE DB |
joshua.fry@dot.ca.gov | Joshua Fry | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1021-1030 of 1400 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-01-31-46 | 01/31/2022 | 02/01/2022 | Quality Assurance | Concrete | View |
2022-02-28-24 | 02/28/2022 | 02/01/2022 | Quality Assurance | Aggregate | View |
2022-02-01-27 | 02/01/2022 | 02/02/2022 | Quality Assurance | Concrete | View |
2022-02-01-28 | 02/01/2022 | 02/02/2022 | Quality Assurance | Concrete | View |
2022-02-01-29 | 02/01/2022 | 02/02/2022 | Quality Assurance | Concrete | View |
2022-02-01-30 | 02/01/2022 | 02/02/2022 | Quality Assurance | Concrete | View |
2022-02-02-32 | 02/02/2022 | 02/03/2022 | Quality Assurance | Concrete | View |
2022-02-03-17 | 02/03/2022 | 02/04/2022 | Quality Assurance | Concrete | View |
2022-02-03-37 | 02/03/2022 | 02/04/2022 | Quality Assurance | Concrete | View |
2022-02-04-18 | 02/04/2022 | 02/05/2022 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods