Project Details
This page displays current information for project DEA: 044G8204.
Project Information
Project Identifiers | Project ID: 213653 DEA: 044G8204 EFIS: 0413000049 |
---|---|
DIST-CO-RTE-PM | 04-MRN-101-10.6/10.8 |
Award Date | 05/05/2020 |
Closeout Date | 08/14/2023 |
Work Description | REPLACE SAN RAFAEL HARBOR BRIDGE (ABC) |
Location Description | MARIN COUTY, IN SAN RAFAEL, FROM ROUTE 101 NORTHBOUND OFF-RAMP TO 2ND STREET |
QA Service Level | 1 (Verified on 05/31/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
dawit.habteselassie@dot.ca.gov | Dawit Habteselassie | Resident Engineer | Caltrans RE DB |
long.ly@dot.ca.gov | Long N Ly | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 41-50 of 125 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-12-06-34 | 12/06/2021 | 12/16/2021 | Quality Assurance | Concrete | View |
2022-08-04-39 | 08/04/2022 | 08/10/2022 | Quality Assurance | Concrete | View |
2022-08-04-40 | 08/04/2022 | 08/10/2022 | Quality Assurance | Concrete | View |
2022-08-04-41 | 08/04/2022 | 08/10/2022 | Quality Assurance | Concrete | View |
2022-08-04-42 | 08/04/2022 | 08/10/2022 | Quality Assurance | Concrete | View |
2022-08-24-39 | 08/24/2022 | 08/29/2022 | Quality Assurance | Concrete | View |
2022-08-24-40 | 08/24/2022 | 08/29/2022 | Quality Assurance | Concrete | View |
2022-09-07-33 | 09/07/2022 | 09/08/2022 | Quality Assurance | Concrete | View |
2020-10-22-12 | 10/22/2020 | 10/23/2020 | Quality Control | Concrete | View |
2021-01-13-5 | 01/13/2021 | 01/15/2021 | Quality Control | SMTL TM5 - Welded Hoops | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods