Project Details
This page displays current information for project DEA: 04270104.
Project Information
Project Identifiers | Project ID: 213631 DEA: 04270104 EFIS: 0412000131 |
---|---|
DIST-CO-RTE-PM | 04-ALA-580-R30.8/R41.5 |
Award Date | 01/07/2019 |
Closeout Date | 01/13/2023 |
Work Description | REPLACE SLABS, RESURFACE SHOULDER & RAMPS & CONSTRUCT MBGR & BARRIER |
Location Description | ALAMEDA COUNTY FROM ROUTE 580/ROUTE 238 SEPARATION TO BOSTON AVENUE UNDERCROSSING. |
QA Service Level | 1 (Verified on 04/23/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
raif.rihani@dot.ca.gov | Raif Rihani | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-5 of 5 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2019-11-26-28 | 11/26/2019 | 03/06/2020 | Annual Source Testing | Aggregate | View |
2019-11-26-27 | 11/26/2019 | 03/06/2020 | Annual Source Testing | Aggregate | View |
2019-11-26-26 | 11/26/2019 | 03/06/2020 | Annual Source Testing | Aggregate | View |
2019-10-25-19 | 10/25/2019 | 10/28/2019 | Department Acceptance | Asphalt Binder | View |
2019-10-25-18 | 10/25/2019 | 10/25/2019 | Department Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods