Project Details
This page displays current information for project DEA: 081E5504.
Project Information
Project Identifiers | Project ID: 213605 DEA: 081E5504 |
---|---|
DIST-CO-RTE-PM | 08-SBD-127-28.0/R28.5 |
Award Date | 11/09/2018 |
Closeout Date | 05/31/2019 |
Work Description | CONSTRUCT 8' SHOULDERS AND INSTALL 12" RUMBLE STRIPS (AC PAVEMENT) |
Location Description | IN SAN BERNARDINO COUNTY ABOUT 28 MILES NORTH ON BAKER FROM 28 MILES TO 28.5 MILES NORTH OF ROUTE 15 |
QA Service Level | 1 (Verified on 01/07/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
No results found. |
Samples
Samples submitted for this project.
Displaying 1-3 of 3 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2019-03-08-11 | 03/08/2019 | 03/11/2019 | Acceptance | Hot Mix Asphalt | View |
2019-03-19-9 | 03/19/2019 | 03/20/2019 | Acceptance | Hot Mix Asphalt | View |
2019-03-20-4 | 03/20/2019 | 03/21/2019 | Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods