Project Details
This page displays current information for project DEA: 043K2304.
Project Information
Project Identifiers | Project ID: 213562 DEA: 043K2304 EFIS: 0417000116 |
---|---|
DIST-CO-RTE-PM | 04-ALA-I-880- |
Award Date | 10/11/2018 |
Closeout Date | 06/08/2022 |
Work Description | Construction of three new commuter parking lot facilities within Caltrans right-of-way under the Interstate 880 (I-880), I-80 and I-580 freeways to serve as park and ride lots for commuters. |
Location Description | the I-80/I-580/Buchanan Street interchange in the City of Albany (Location 1), and the I-880/Fruitvale Avenue interchange (Location 2) and I-880/High Street interchange (Location 3) in the City of Oakland. |
QA Service Level | 2 (Verified on 08/19/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
rui.zhang@dot.ca.gov | Rui Zhang | Resident Engineer | Caltrans RE DB |
jacob.jones@wsp.com | Jacob Jones | Oversight Resident Engineer | Caltrans REO DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods