Project Details

This page displays current information for project DEA: 060Q2804.

Project Information

Project IdentifiersProject ID: 213444
DEA: 060Q2804
EFIS: 0613000051
DIST-CO-RTE-PM06-KER-99,178-23.8/R28.4,0.1
Award Date10/03/2018
Closeout Date05/11/2023
Work DescriptionRECONSTRUCT LANES AND SHOULDERS WITH CRCP, MODIFYING ELECTRICAL SYSTEM
Location DescriptionKERN COUNTY IN BAKERSFIELD ON ROUTE 99 FROM 0.3 MILE SOUTH OF PALM AVENUE OVERCROSSING TO BEARDSLEY CANAL BRIDGE AND ON ROUTE 178 AT ROUTE 99/178 SEPARATION
QA Service Level1 (Verified on 12/13/2018)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
hugo.camberos@dot.ca.govHugo CamberosResident EngineerCaltrans RE DB
lmelendez@trccompanies.comLuis MelendezStructural RepresentativeCaltrans SR DB

Samples

Samples submitted for this project.

Displaying 1-10 of 10 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2019-09-16-1509/16/201909/20/2019Quality AssuranceSMTL TM7 - Epoxy Coated RebarView
2019-12-20-912/20/201912/26/2019Quality AssuranceSMTL TM5 - CouplersView
2020-10-15-1110/15/202010/22/2020Department AcceptanceAsphalt BinderView
2020-10-29-610/29/202011/03/2020Quality AssuranceSMTL TM2 - Type B Elastomeric Joint SealView
2020-10-29-710/29/202011/03/2020Quality AssuranceSMTL TM2 - Type B Elastomeric Joint SealView
2020-10-29-810/29/202011/03/2020Quality AssuranceSMTL TM2 - Type B Elastomeric Joint SealView
2021-03-24-2203/24/202103/30/2021Department AcceptanceAsphalt BinderView
2021-07-19-107/19/202107/19/2021Quality AssuranceSMTL TM5 - CouplersView
2021-08-10-1408/10/202108/17/2021Department AcceptanceAsphalt BinderView
2022-01-25-2401/25/202201/31/2022Quality AssuranceSMTL TM5 - CouplersView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods