Project Details
This page displays current information for project DEA: 120Q3404.
Project Information
Project Identifiers | Project ID: 213404 DEA: 120Q3404 EFIS: 1216000130 Permit Numbers: 1217NMC0723 1218NDP0423 1218NRT0056 |
---|---|
DIST-CO-RTE-PM | 12-ORA-241-13.1/16.7 |
Award Date | 01/03/2018 |
Closeout Date | 08/19/2021 |
Work Description | Construct the Oso PWY bridge and extend SR-241 to connect to Los Patrones PKW. in the County of Orange. Two lanes will be constructed of HMA in each direction on SR-241. Oso Parkway N/B on-ramp and S/B off-ramp gores will be modified to connect to new mainline pavement. improve new overhead signs, |
Location Description | OSO PARKWAY INTERCHANGE, COUNTY OF ORANGE |
QA Service Level | 2 (Verified on 06/05/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
kami.fallah@dot.ca.gov | Kami Fallah | Resident Engineer | Caltrans RE DB |
irfan.patel@jacobs.com | Ifran Patel | Oversight Resident Engineer | Caltrans REO DB |
Sara.Soleimani@dot.ca.gov | Sara Solemani | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-2 of 2 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-09-14-23 | 09/14/2023 | 09/15/2023 | Acceptance | Hot Mix Asphalt | View |
2023-08-31-27 | 08/31/2023 | 08/31/2023 | Verification | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods