Project Details
This page displays current information for project DEA: 081G6204.
Project Information
Project Identifiers | Project ID: 213078 DEA: 081G6204 EFIS: 0816000031 |
---|---|
DIST-CO-RTE-PM | 08-RIV-10,86-Var |
Award Date | 04/06/2018 |
Closeout Date | 05/10/2019 |
Work Description | COLD PLANE, RHMA-G OVERLAY, REPLACE PRECAST SLAB AND LOCALIZED DIG-OUT |
Location Description | IN RIVERSIDE COUNTY AT VARIOUS LOCATIONS |
QA Service Level | 1 (Verified on 04/09/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
peter.koury@dot.ca.gov | Peter Koury | Resident Engineer | Caltrans RE DB |
arvind.k.patel@dot.ca.gov | Arvindkumar Patel | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-9 of 9 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2018-09-05-6 | 09/05/2018 | 09/07/2018 | Quality Assurance | SMTL TM7 - Epoxy Coated Dowels | View |
2019-01-28-12 | 01/28/2019 | 01/29/2019 | Quality Assurance | Hot Mix Asphalt | View |
2019-02-01-5 | 02/01/2019 | 02/04/2019 | Acceptance | Hot Mix Asphalt | View |
2019-02-13-9 | 02/13/2019 | 02/14/2019 | Acceptance | Hot Mix Asphalt | View |
2019-03-06-3 | 03/06/2019 | 03/07/2019 | Acceptance | Hot Mix Asphalt | View |
2019-03-05-7 | 03/05/2019 | 03/06/2019 | Acceptance | Hot Mix Asphalt | View |
2019-03-06-4 | 03/06/2019 | 03/06/2019 | Acceptance | Hot Mix Asphalt | View |
2019-03-01-11 | 03/01/2019 | 03/04/2019 | Acceptance | Hot Mix Asphalt | View |
2019-02-28-4 | 02/28/2019 | 03/01/2019 | Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods