Project Details
This page displays current information for project DEA: 07292304.
Project Information
Project Identifiers | Project ID: 213062 DEA: 07292304 EFIS: 0712000109 |
---|---|
DIST-CO-RTE-PM | 07-LA-5-25.6/26.0 |
Award Date | 04/04/2018 |
Closeout Date | 06/08/2020 |
Work Description | WIDEN OFF-RAMP, WIDEN BRIDGE, AND CONSTRUCT CONCRETE BARRIER. |
Location Description | LOS ANGELES COUNTY IN LOS ANGELES FROM 0.1 MILE SOUTH TO 0.2 MILE NORTH OF ROUTE 5S/5 SEPARATION |
QA Service Level | 1 (Verified on 04/18/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
darrell.mckenzie@dot.ca.gov | Darrell McKenzie | Resident Engineer | Caltrans RE DB |
aziz@goanalyzer.com | Aziz Maghsoudloo | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-4 of 4 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2019-01-09-4 | 01/09/2019 | 02/08/2019 | Quality Assurance | SMTL TM5 - Couplers | View |
2018-10-11-2 | 10/11/2018 | 10/11/2018 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2018-09-27-3 | 09/27/2018 | 09/26/2018 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
2018-07-10-2 | 07/10/2018 | 07/11/2018 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods