Project Details
This page displays current information for project DEA: 033F5304.
Project Information
Project Identifiers | Project ID: 212993 DEA: 033F5304 EFIS: 0313000135 |
---|---|
DIST-CO-RTE-PM | 03-ED-50-67.3 |
Award Date | 11/09/2018 |
Closeout Date | 09/20/2022 |
Work Description | ECHO SUMMIT BRIDGE IS A 24-FT WIDE, THREE-SPAN, REINFORCED CONCRETE GIRDER BRIDGE |
Location Description | EL DORADO COUNTY NEAR MEYERS AT ECHO SUMMIT SIDEHILL VIADUCT |
QA Service Level | 1 (Verified on 01/08/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
nathan.alterton@dot.ca.gov | Nathan Alterton | Resident Engineer | Caltrans RE DB |
Brandon.Miller@dot.ca.gov | Brandon Miller | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 31-40 of 72 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2019-08-27-6 | 08/27/2019 | 08/27/2019 | Quality Assurance | Concrete | View |
2019-08-27-5 | 08/27/2019 | 08/27/2019 | Quality Assurance | Concrete | View |
2019-08-27-4 | 08/27/2019 | 08/27/2019 | Quality Assurance | Concrete | View |
2019-08-21-12 | 08/21/2019 | 08/22/2019 | Quality Assurance | Concrete | View |
2019-08-21-11 | 08/21/2019 | 08/22/2019 | Quality Assurance | Concrete | View |
2019-08-21-10 | 08/21/2019 | 08/22/2019 | Quality Assurance | Concrete | View |
2019-08-21-9 | 08/21/2019 | 08/22/2019 | Quality Assurance | Concrete | View |
2019-07-15-4 | 07/15/2019 | 07/15/2019 | Quality Assurance | Concrete | View |
2019-07-03-5 | 07/03/2019 | 07/10/2019 | Quality Assurance | Concrete | View |
2019-07-02-33 | 07/02/2019 | 07/02/2019 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods