Project Details

This page displays current information for project DIME:212923.

Project Information

Project IdentifiersProject ID: 212923
Permit Numbers: 1016NMC0531 1017NRT0598
DIST-CO-RTE-PM10---18.6
Award Date09/07/2016
Closeout Date01/22/2020
Work DescriptionInstall and maintain in perpetuity the Emergency Vehicle Preemption System at the intersection of Filbert Street and the on/off ramps of State Route 4 in Stockton, as shown on the approved plans. The preemption system will include the installation of Optical detectors on the traffic signal poles,
Location DescriptionSR 4, Stockton
QA Service Level1 (Verified on 12/05/2017)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
joseph.a.valdez@dot.ca.govJoe ValdezResident EngineerCaltrans RE DB

Samples

Samples submitted for this project.

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods