Project Details
This page displays current information for project DEA: 04160304.
Project Information
Project Identifiers | Project ID: 212896 DEA: 04160304 EFIS: 0400000429 |
---|---|
DIST-CO-RTE-PM | 04-ALA-84-13.1/13.5 |
Award Date | 12/15/2020 |
Closeout Date | Not set |
Work Description | NILES CANYON ALAMEDA CREEK BRIDGE REPLACEMENT |
Location Description | IN FREMONT, AT ALAMEDA CREEK BRIDGE (BR 33-0036). |
QA Service Level | 1 (Verified on 09/16/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
oanh.bui@dot.ca.gov | Oanh Bui | Structural Representative | Caltrans SR DB |
dylan.larose@dot.ca.gov | Dylan Larose | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 151-160 of 195 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-07-14-48 | 07/14/2021 | 07/14/2021 | Quality Control | Aggregate | View |
2021-07-14-47 | 07/14/2021 | 07/14/2021 | Quality Control | Aggregate | View |
2021-08-27-25 | 08/27/2021 | 09/03/2021 | Quality Assurance | Concrete | View |
2021-08-18-48 | 08/18/2021 | 09/03/2021 | Quality Assurance | Concrete | View |
2021-08-06-31 | 08/06/2021 | 09/03/2021 | Quality Assurance | Concrete | View |
2021-08-24-4 | 08/24/2021 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2021-08-24-3 | 08/24/2021 | 08/27/2021 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2021-08-20-4 | 08/20/2021 | 08/27/2021 | Verification | SMTL TM5 - Headed Bars | View |
2021-08-20-3 | 08/20/2021 | 08/27/2021 | Verification | SMTL TM5 - Headed Bars | View |
2021-08-09-4 | 08/09/2021 | Quality Control | SMTL TM5 - Welded Hoops | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods