Project Details
This page displays current information for project DEA: 101C3004.
Project Information
Project Identifiers | Project ID: 212697 DEA: 101C3004 EFIS: 1014000145 |
---|---|
DIST-CO-RTE-PM | 10-STA,SJ-99-R20.9/R24.7, 0.0/6.8 |
Award Date | 12/20/2017 |
Closeout Date | 01/04/2021 |
Work Description | RAMP WIDENING, DRAINAGE, RAMP METERS, AND FIBER OPTIC SYSTEM. |
Location Description | STANISLAUS AND SAN JOAQUIN COUNTIES FROM 0.8 MILE SOUTH OF PELANDALE AVENUE OVERCROSSING IN MODESTO TO 0.2 MILE NORTH OF THE NORTH JUNCTION ROUTE 120/99 SEPARATION IN MANTECA |
QA Service Level | 1 (Verified on 01/25/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
chris.hanson@dot.ca.gov | Chris Hanson | Resident Engineer | Caltrans RE DB |
george_samuel@dot.ca.gov | George Samuel | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-1 of 1 result.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2018-11-01-1 | 11/01/2018 | 11/09/2018 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods