Project Details
This page displays current information for project DEA: 010B5504.
Project Information
Project Identifiers | Project ID: 212573 DEA: 010B5504 EFIS: 0112000137 |
---|---|
DIST-CO-RTE-PM | 01-MEN-162-16.2 |
Award Date | 09/28/2017 |
Closeout Date | 10/05/2020 |
Work Description | RECONSTRUCT ROADWAY, CONSTRUCT SOLDIER PILE AND TIEBACK WALL |
Location Description | MENDOCINO COUNTY ON ROUTE 162 1 MILE EAST OF MIDDLE FORK EEL RIVER BRIDGE |
QA Service Level | 1 (Verified on 10/03/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
nash.munes@dot.ca.gov | Munes Nash | Resident Engineer | Caltrans RE DB |
Brian.Cinkutis@dot.ca.gov | Brian Cinkutis | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-5 of 5 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2018-08-14-8 | 08/14/2018 | 08/14/2018 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
2018-02-01-2 | 02/01/2018 | 02/01/2018 | Verification | SMTL TM3 - Fastener Assembly | View |
2018-08-30-1 | 08/30/2018 | 08/31/2018 | Verification | SMTL TM3 - Fastener Assembly | View |
2018-11-10-1 | 11/10/2018 | 11/28/2018 | Quality Assurance | SMTL TM5 - Couplers | View |
2018-11-10-2 | 11/10/2018 | 11/28/2018 | Quality Assurance | SMTL TM5 - Couplers | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods