Project Details
This page displays current information for project DEA: 053307A4.
Project Information
Project Identifiers | Project ID: 212246 DEA: 053307A4 EFIS: 0514000027 |
---|---|
DIST-CO-RTE-PM | 05-SLO-46-49.7/54.6 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Cholame Segment |
Location Description | Not set |
QA Service Level | 1 (Verified on 09/30/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
andrew.borrelli@dot.ca.gov | Andrew Borrelli | Resident Engineer | Caltrans RE DB |
christopher.m.mcdermott@dot.ca.gov | Christopher McDermott | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 41-50 of 1338 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-12-15-60 | 12/15/2023 | 12/16/2023 | Quality Control | Concrete | View |
2023-12-11-24 | 12/11/2023 | 12/11/2023 | Acceptance | Roadway/Bridge Surface | View |
2023-12-06-15 | 12/06/2023 | 12/06/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-12-06-16 | 12/06/2023 | 12/05/2023 | Quality Assurance | Aggregate | View |
2023-12-06-19 | 12/06/2023 | 01/02/2024 | Dispute Resolution | Aggregate | View |
2023-12-05-45 | 12/05/2023 | 12/05/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-12-05-46 | 12/05/2023 | 12/05/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-12-05-49 | 12/05/2023 | 12/05/2023 | Quality Assurance | Aggregate | View |
2023-12-05-50 | 12/05/2023 | 12/05/2023 | Quality Assurance | Aggregate | View |
2023-12-05-55 | 12/05/2023 | 12/28/2023 | Dispute Resolution | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods