Project Details
This page displays current information for project DEA: 010G9204.
Project Information
Project Identifiers | Project ID: 212151 DEA: 010G9204 |
---|---|
DIST-CO-RTE-PM | 01-HUM-36-19/44, 3.0/44.0 |
Award Date | 02/03/2017 |
Closeout Date | 05/08/2019 |
Work Description | Repair slide near Bridgeville |
Location Description | Not set |
QA Service Level | 1 (Verified on 10/03/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
robert.king@dot.ca.gov | Robert King | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-1 of 1 result.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2018-02-20-37 | 02/20/2018 | 07/19/2018 | Preliminary | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods