Project Details
This page displays current information for project DEA: 080C2514.
Project Information
Project Identifiers | Project ID: 212112 DEA: 080C2514 EFIS: 0816000076 COOP: 081645 |
---|---|
DIST-CO-RTE-PM | 08-SBD-10-0.0/13.2 |
Award Date | 06/06/2018 |
Closeout Date | Not set |
Work Description | Design-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes |
Location Description | LA/SBD County Line to PM 13.2 near I-15 |
QA Service Level | 1 (Verified on 10/16/2019) |
Samples
Samples submitted for this project.
Displaying 21-30 of 873 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-04-26-81 | 04/26/2023 | 05/09/2023 | Acceptance | Hot Mix Asphalt | View |
2023-04-25-4 | 04/25/2023 | 04/27/2023 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2023-04-25-90 | 04/25/2023 | 05/23/2023 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2023-04-24-14 | 04/24/2023 | 04/24/2023 | Quality Assurance | Soil | View |
2023-04-24-15 | 04/24/2023 | 04/24/2023 | Quality Assurance | Soil | View |
2023-04-24-16 | 04/24/2023 | 04/24/2023 | Quality Assurance | Soil | View |
2023-04-24-17 | 04/24/2023 | 04/24/2023 | Quality Assurance | Soil | View |
2023-04-24-18 | 04/24/2023 | 04/24/2023 | Quality Assurance | Soil | View |
2023-04-24-62 | 04/24/2023 | 05/04/2023 | Acceptance | Hot Mix Asphalt | View |
2023-04-24-63 | 04/24/2023 | 05/04/2023 | Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods