Project Details

This page displays current information for project DEA: 07296604.

Project Information

Project IdentifiersProject ID: 212085
DEA: 07296604
EFIS: 0713000057
DIST-CO-RTE-PM07-LA-10-14.0/19.0
Award Date06/04/2018
Closeout Date05/04/2023
Work DescriptionPAINT AND REHABILITATE BRIDGE - (STRAIN (PAINT AND INSTALL CATWALK)
Location DescriptionIN THE CITY OF LOS ANGELES, AT SANTA MONICA VIADUCT (BR. NO. 53-1301). PAINT AND REHABILITATE BRIDGE
QA Service Level1 (Verified on 07/25/2018)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
susana.e.facio@dot.ca.govSusana FacioResident EngineerCaltrans RE DB
nabil.shmara@dot.ca.govNabil ShmaraStructural RepresentativeCaltrans SR DB
jeffrey.yu@dot.ca.govJeffrey YuMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 1-10 of 37 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2020-11-17-111/17/202011/20/2020Quality AssuranceSMTL TM3 - Fastener AssemblyView
2020-11-17-211/17/202011/20/2020Quality AssuranceSMTL TM3 - Fastener AssemblyView
2020-11-17-311/17/202011/20/2020Quality AssuranceSMTL TM3 - Fastener AssemblyView
2020-11-17-411/17/202011/20/2020Quality AssuranceSMTL TM3 - Fastener AssemblyView
2020-11-17-511/17/202011/20/2020Quality AssuranceSMTL TM3 - Fastener AssemblyView
2020-11-17-611/17/202011/20/2020Quality AssuranceSMTL TM3 - Fastener AssemblyView
2020-11-30-111/30/202012/03/2020Quality AssuranceSMTL TM3 - Fastener AssemblyView
2020-11-30-211/30/202012/03/2020Quality AssuranceSMTL TM3 - Fastener AssemblyView
2020-11-30-311/30/202012/03/2020Quality AssuranceSMTL TM3 - Fastener AssemblyView
2020-11-30-411/30/202012/04/2020Quality AssuranceSMTL TM3 - Fastener AssemblyView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods