Project Details
This page displays current information for project DEA: 044K2404.
Project Information
Project Identifiers | Project ID: 212036 DEA: 044K2404 EFIS: 0417000284 |
---|---|
DIST-CO-RTE-PM | 04-MRN,MRN-1-10.9, 10.8/10.9, 10.90, 6.6/10.9 |
Award Date | 01/31/2017 |
Closeout Date | 10/17/2022 |
Work Description | Construct Solier Pile Wall |
Location Description | Not set |
QA Service Level | 1 (Verified on 03/17/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
dawit.habteselassie@dot.ca.gov | Dawit Habteselassie | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 31-32 of 32 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2017-04-18-10 | 04/18/2017 | 05/16/2017 | Quality Assurance | Concrete | View |
2017-04-17-6 | 04/17/2017 | 05/16/2017 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods