Project Details
This page displays current information for project DEA: 043G6414.
Project Information
Project Identifiers | Project ID: 211931 DEA: 043G6414 EFIS: 0416000348 |
---|---|
DIST-CO-RTE-PM | 04-NAP-29-37.0 |
Award Date | 03/17/2017 |
Closeout Date | 04/22/2020 |
Work Description | SCOUR REPLACE BRIDGE |
Location Description | NAPA COUNTY IN CALISTOGA AT NAPA RIVER BRIDGE |
QA Service Level | 1 (Verified on 02/15/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
danilo.patenia@dot.ca.gov | Danilo Patenia | Resident Engineer | Caltrans RE DB |
nana.budu@dot.ca.gov | Nana Budu | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 39 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2018-12-12-4 | 12/12/2018 | 12/19/2018 | Department Acceptance | Concrete | View |
2018-12-05-7 | 12/05/2018 | 12/19/2018 | Department Acceptance | Concrete | View |
2018-12-05-6 | 12/05/2018 | 12/19/2018 | Department Acceptance | Concrete | View |
2018-11-05-4 | 11/05/2018 | 11/08/2018 | Department Acceptance | Concrete | View |
2018-11-05-3 | 11/05/2018 | 11/08/2018 | Department Acceptance | Concrete | View |
2018-11-05-2 | 11/05/2018 | 11/08/2018 | Department Acceptance | Concrete | View |
2018-09-26-13 | 09/26/2018 | 10/01/2018 | Department Acceptance | Concrete | View |
2018-09-26-12 | 09/26/2018 | 10/01/2018 | Department Acceptance | Concrete | View |
2018-09-26-11 | 09/26/2018 | 10/01/2018 | Department Acceptance | Concrete | View |
2018-06-12-10 | 06/12/2018 | 06/11/2018 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods