Project Details

This page displays current information for project DEA: 08368514.

Project Information

Project IdentifiersProject ID: 211889
DEA: 08368514
EFIS: 0813000077
DIST-CO-RTE-PM08-SBD-15-81.1/87.5&177.3/181.1
Award Date05/02/2017
Closeout Date12/09/2019
Work DescriptionCONSTRUCT AIF AND DEMOLISH EXISTING AIF IN YERMO
Location DescriptionSAN BERNARDINO COUNTY FROM 0.6 MILE NORTH OF YERMO ROAD OVERCROSSING TO 1.0 MILE SOUTH OF MINNEOLA ROAD OVERCROSSING AND FROM 1.2 MILE NORTH OF NIPTON ROAD OVERCROSSING TO 0.5 MILE SOUTH OF YATES WELL ROAD OVERCROSSING
QA Service Level1 (Verified on 04/07/2017)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
darcy.davis@dot.ca.govDarcy DavisResident EngineerCaltrans RE DB
luis.negrete@dot.ca.govLuis NegreteStructural RepresentativeCaltrans SR DB
julien.atallah@dot.ca.govJulien AtallahMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 1-10 of 19 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
2017-11-01-2411/01/201711/01/2017Quality AssuranceConcreteView
2017-11-06-811/06/201711/15/2017Quality AssuranceSMTL TM3 - Fastener AssemblyView
2017-11-14-1111/14/201711/20/2017Quality AssuranceConcreteView
2017-11-15-311/15/201711/15/2017Quality AssuranceConcreteView
2017-12-04-712/04/201712/07/2017Quality AssuranceConcreteView
2017-12-01-412/01/201712/07/2017Quality AssuranceConcreteView
2017-12-11-812/11/201712/11/2017Quality AssuranceSMTL TM3 - Fastener AssemblyView
2017-12-14-112/14/201712/14/2017Quality AssuranceSMTL TM3 - Fastener AssemblyView
2017-12-11-912/11/201712/15/2017Quality AssuranceConcreteView
2017-12-18-1812/18/201712/21/2017Quality AssuranceConcreteView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods