Project Details
This page displays current information for project DEA: 112T2174.
Project Information
Project Identifiers | Project ID: 211848 DEA: 112T2174 EFIS: 1116000131 |
---|---|
DIST-CO-RTE-PM | 11-SD-5-R37.4 - R46.5 |
Award Date | 12/22/2016 |
Closeout Date | Not set |
Work Description | (Alternative Delivery) CMGC, San Elijo Highway Bridge Replacement. Replace the San Elijo lagoon highway bridge, construct HOV lanes, construct bike and pedestrian trails and bridge, build multi-use facility at Manchester Ave. |
Location Description | IN SAN DIEGO COUNTY IN SOLANA BEACH AND ENCINITAS FROM 0.1 MILE NORTH OF LOMAS SANTA FE DRIVE OVERCROSSING TO 0.2 MILE SOUTH OF BIRMINGHAM DRIVE OVERCROSSING |
QA Service Level | 1 (Verified on 01/31/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
steve.mcmillan@dot.ca.gov | Steve McMillan | Resident Engineer | Caltrans RE DB |
phong.t.le@dot.ca.gov | Phong Le | Structural Representative | Caltrans SR DB |
kenneth.yu@dot.ca.gov | Kenneth Yu | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 237 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-08-26-3 | 08/26/2021 | 09/01/2021 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2021-03-30-14 | 03/30/2021 | 04/01/2021 | Quality Assurance | SMTL TM5 - Couplers | View |
2021-03-26-7 | 03/26/2021 | 04/01/2021 | Quality Assurance | SMTL TM5 - Couplers | View |
2021-03-23-1 | 03/23/2021 | 03/25/2021 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2021-02-26-10 | 02/26/2021 | 03/04/2021 | Quality Assurance | SMTL TM4 - Prestressing Strand | View |
2020-12-30-1 | 12/30/2020 | 01/04/2021 | Quality Assurance | SMTL TM5 - Couplers | View |
2020-12-01-3 | 12/01/2020 | 12/03/2020 | Quality Assurance | SMTL TM5 - Couplers | View |
2020-11-19-1 | 11/19/2020 | 11/30/2020 | Quality Assurance | SMTL TM5 - Couplers | View |
2020-10-06-2 | 10/06/2020 | 10/07/2020 | Quality Assurance | SMTL TM5 - Couplers | View |
2020-09-30-2 | 09/30/2020 | 10/05/2020 | Quality Assurance | SMTL TM5 - Headed Bars | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods