Project Details

This page displays current information for project DEA: 11085784.

Project Information

Project IdentifiersProject ID: 211784
DEA: 11085784
EFIS: 1100000064
DIST-CO-RTE-PM11-SD-163-4.1/4.9
Award Date06/16/2017
Closeout Date08/10/2021
Work DescriptionINTERCHANGE MODIFICATION AND OVERCROSSING WIDENING.
Location DescriptionSAN DIEGO COUNTY IN SAN DIEGO FROM 0.3 MILE SOUTH TO 0.5 MILE NORTH OF FRIARS ROAD OVERCROSSING
QA Service Level1 (Verified on 09/05/2017)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
dave.m.cortez@dot.ca.govDave CortezResident EngineerCaltrans RE DB
alex.balce@dot.ca.govAlex BalceStructural RepresentativeCaltrans SR DB
julien.atallah@dot.ca.govJulien AtallahMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 11-20 of 24 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
2018-04-11-704/11/201804/18/2018Quality AssuranceSMTL TM3 - Fastener AssemblyView
2018-05-14-605/14/201805/18/2018Quality AssuranceSMTL TM3 - Fastener AssemblyView
2018-07-09-807/09/201807/16/2018Quality AssuranceSMTL TM6 - Ductile Iron Cast SamplesView
2018-10-04-410/04/201810/22/2018Quality AssuranceSMTL TM5 - CouplersView
2019-02-08-502/08/201902/22/2019Quality AssuranceSMTL TM5 - CouplersView
2019-02-22-902/22/201902/27/2019Quality AssuranceSMTL TM4 - Prestressing StrandView
2019-04-16-404/16/201904/16/2019Quality AssuranceSMTL TM3 - Fastener AssemblyView
2019-04-16-504/16/201904/16/2019Quality AssuranceSMTL TM3 - Fastener AssemblyView
2019-04-16-604/16/201904/16/2019Quality AssuranceSMTL TM3 - Fastener AssemblyView
2019-04-16-704/16/201904/16/2019Quality AssuranceSMTL TM3 - Fastener AssemblyView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods