Project Details
This page displays current information for project DEA: 04235654.
Project Information
Project Identifiers | Project ID: 211778 DEA: 04235654 EFIS: 0400000680 |
---|---|
DIST-CO-RTE-PM | 04-SM-101,114-1.3/2.5,5.0/5.3 |
Award Date | 02/10/2017 |
Closeout Date | 01/08/2020 |
Work Description | RECONSTRUCT INTERCHANGE |
Location Description | SAN MATEO COUNTY AT VARIOUS LOCATIONS ON ROUTE 101 FROM 0.4 MILE NORTH OF UNIVERSITY AVENUE OVERCROSSING TO 0.6 MILE SOUTH OF HENDERSON UNDERPASS AND ON ROUTE 114 FROM WILLOW ROAD SEPARATION TO NEWBRIDGE STREET |
QA Service Level | 1 (Verified on 10/24/2016) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
oanh.bui@dot.ca.gov | Oanh Bui | Structural Representative | Caltrans SR DB |
saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 51-60 of 115 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2018-03-09-12 | 03/09/2018 | 03/13/2018 | Quality Assurance | Concrete | View |
2018-03-09-13 | 03/09/2018 | 03/13/2018 | Quality Assurance | Concrete | View |
2018-03-27-4 | 03/27/2018 | 04/06/2018 | Quality Assurance | Concrete | View |
2018-03-27-5 | 03/27/2018 | 04/06/2018 | Quality Assurance | Concrete | View |
2018-03-28-14 | 03/28/2018 | 04/06/2018 | Quality Assurance | Concrete | View |
2018-03-28-15 | 03/28/2018 | 04/06/2018 | Quality Assurance | Concrete | View |
2018-04-10-7 | 04/10/2018 | 04/26/2018 | Quality Assurance | Concrete | View |
2018-04-10-8 | 04/10/2018 | 04/26/2018 | Quality Assurance | Concrete | View |
2018-04-17-12 | 04/17/2018 | 04/26/2018 | Quality Assurance | Concrete | View |
2018-04-17-13 | 04/17/2018 | 04/26/2018 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods