Project Details
This page displays current information for project DEA: 080R1204.
Project Information
Project Identifiers | Project ID: 211714 DEA: 080R1204 EFIS: 0812000026 |
---|---|
DIST-CO-RTE-PM | 08-SBD-40-0.0/R25.0 |
Award Date | 12/21/2016 |
Closeout Date | 06/23/2021 |
Work Description | REGRADE MEDIAN CROSS SLOPE |
Location Description | SAN BERNARDINO COUNTY IN AND NEAR BARSTOW FROM JUNCTION 15/40 TO 1.4 MILES EAST OF FORT CADY ROAD OVERCROSSING |
QA Service Level | 1 (Verified on 09/21/2016) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
thanh.pham@dot.ca.gov | Thanh Pham | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 32 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2017-09-15-6 | 09/15/2017 | 09/19/2017 | Quality Assurance | Concrete | View |
2017-09-20-8 | 09/20/2017 | 09/25/2017 | Quality Assurance | Concrete | View |
2017-10-05-3 | 10/05/2017 | 10/10/2017 | Quality Assurance | Concrete | View |
2017-10-12-2 | 10/12/2017 | 10/17/2017 | Quality Assurance | Concrete | View |
2017-10-17-3 | 10/17/2017 | 10/20/2017 | Quality Assurance | Concrete | View |
2017-10-19-12 | 10/19/2017 | 10/24/2017 | Quality Assurance | Concrete | View |
2017-12-08-3 | 12/08/2017 | 12/13/2017 | Quality Assurance | Concrete | View |
2017-12-19-25 | 12/19/2017 | 12/27/2017 | Quality Assurance | Concrete | View |
2018-01-04-16 | 01/04/2018 | 01/09/2018 | Quality Assurance | Concrete | View |
2018-01-11-11 | 01/11/2018 | 01/15/2018 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods