Project Details
This page displays current information for project DEA: 080R1204.
Project Information
Project Identifiers | Project ID: 211714 DEA: 080R1204 EFIS: 0812000026 |
---|---|
DIST-CO-RTE-PM | 08-SBD-40-0.0/R25.0 |
Award Date | 12/21/2016 |
Closeout Date | 06/23/2021 |
Work Description | REGRADE MEDIAN CROSS SLOPE |
Location Description | SAN BERNARDINO COUNTY IN AND NEAR BARSTOW FROM JUNCTION 15/40 TO 1.4 MILES EAST OF FORT CADY ROAD OVERCROSSING |
QA Service Level | 1 (Verified on 09/21/2016) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
thanh.pham@dot.ca.gov | Thanh Pham | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 32 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2017-05-22-2 | 05/22/2017 | 05/26/2017 | Quality Assurance | Concrete | View |
2017-06-09-7 | 06/09/2017 | 06/14/2017 | Quality Assurance | Concrete | View |
2017-07-11-9 | 07/11/2017 | 07/18/2017 | Quality Assurance | Concrete | View |
2017-07-07-14 | 07/07/2017 | 07/12/2017 | Quality Assurance | Concrete | View |
2017-07-25-15 | 07/25/2017 | 08/01/2017 | Quality Assurance | Concrete | View |
2017-08-16-7 | 08/16/2017 | 08/22/2017 | Quality Assurance | Concrete | View |
2017-08-31-5 | 08/31/2017 | 09/05/2017 | Quality Assurance | Concrete | View |
2017-08-30-4 | 08/30/2017 | 09/06/2017 | Quality Assurance | Concrete | View |
2017-08-29-1 | 08/29/2017 | 09/06/2017 | Quality Assurance | Concrete | View |
2017-09-13-16 | 09/13/2017 | 09/19/2017 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods