Project Details
This page displays current information for project DEA: 120P1904.
Project Information
Project Identifiers | Project ID: 211661 DEA: 120P1904 EFIS: 1215000050 MINOR: 12A1621 |
---|---|
DIST-CO-RTE-PM | 12--5-13.57 |
Award Date | Not set |
Closeout Date | 06/21/2021 |
Work Description | Involves removing (4) Electroliers and installing (5) Electroliers. |
Location Description | The Department of Transportation (Department) will receive sealed bids for CONSTRUCTION ON STATE HIGHWAY IN City of Mission Viejo. District-County-Route-Post Mile: 12-Ora-Route 5-PM 13.57. (Crown Valley Parkway) |
QA Service Level | 1 (Verified on 09/01/2016) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
danh.thai@dot.ca.gov | Danh Thai | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-1 of 1 result.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2017-01-26-9 | 01/26/2017 | 01/30/2017 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods