Project Details
This page displays current information for project DEA: 033C3804.
Project Information
Project Identifiers | Project ID: 211614 DEA: 033C3804 EFIS: 0300000458 |
---|---|
DIST-CO-RTE-PM | 03-ED-50-75.4/77.3 |
Award Date | 01/23/2017 |
Closeout Date | 12/06/2021 |
Work Description | HOT MIX ASPHALT, ROADWAY EXCAVATION, AND SIGNAL AND LIGHTING |
Location Description | EL DORADO COUNTY IN SOUTH LAKE TAHOE FROM NORTH JUNCTION ROUTE 89 TO TROUT CREEK BRIDGE |
QA Service Level | 1 (Verified on 10/20/2016) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Jaret.Montplaisir@dot.ca.gov | Jaret Montplaisir | Resident Engineer | Caltrans RE DB |
alfredo.carranza@dot.ca.gov | Alfredo Carranza | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 25 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2017-08-03-2 | 08/03/2017 | 08/07/2017 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2018-06-19-11 | 06/19/2018 | 06/22/2018 | Quality Assurance | Concrete | View |
2018-06-19-12 | 06/19/2018 | 06/22/2018 | Quality Assurance | Concrete | View |
2018-06-19-13 | 06/19/2018 | 06/22/2018 | Quality Assurance | Concrete | View |
2018-08-08-7 | 08/08/2018 | 08/10/2018 | Quality Assurance | Concrete | View |
2018-08-08-8 | 08/08/2018 | 08/10/2018 | Quality Assurance | Concrete | View |
2018-08-08-9 | 08/08/2018 | 08/10/2018 | Quality Assurance | Concrete | View |
2018-08-08-10 | 08/08/2018 | 08/10/2018 | Quality Assurance | Concrete | View |
2018-08-08-11 | 08/08/2018 | 08/10/2018 | Quality Assurance | Concrete | View |
2018-10-12-2 | 10/12/2018 | 10/12/2018 | Quality Assurance | SMTL TM7 - Epoxy Coated Rebar | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods