Project Details
This page displays current information for project DEA: 120H2434.
Project Information
Project Identifiers | Project ID: 211371 DEA: 120H2434 EFIS: 1214000038 |
---|---|
DIST-CO-RTE-PM | 12-LA,ORA-91-R20.6/R20.7,R0.0/R2.8 |
Award Date | 06/15/2016 |
Closeout Date | 08/27/2018 |
Work Description | INSTALL FIBER OPTIC CABLE & CCTVS |
Location Description | ORANGE AND LOS ANGELES COUNTIES IN LA PALMA, BUENA PARK AND CERRITOS FROM 0.1 MILE WEST OF LOS ANGELES COUNTY LINE TO STANTON AVENUE UNDERCROSSING |
QA Service Level | 1 (Verified on 09/01/2016) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
danh.thai@dot.ca.gov | Danh Thai | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-3 of 3 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2017-06-28-1 | 06/28/2017 | 06/28/2017 | Verification | SMTL TM3 - Fastener Assembly | View |
2017-02-08-9 | 02/08/2017 | 02/15/2017 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2017-06-28-7 | 06/28/2017 | 06/30/2017 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods