Project Details
This page displays current information for project DEA: 040K6914.
Project Information
Project Identifiers | Project ID: 211076 DEA: 040K6914 |
---|---|
DIST-CO-RTE-PM | 04-SF-80-8.2/8.6 |
Award Date | 12/11/2015 |
Closeout Date | 08/22/2018 |
Work Description | Install grease caps and repair pre-stress tendon |
Location Description | In SF at the eastern span of the SF-Oakland Bay Bridge |
QA Service Level | 1 (Verified on 12/01/2015) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
bill.shedd@dot.ca.gov | Bill Shedd | Resident Engineer | Caltrans RE DB |
thuc.tran@dot.ca.gov | Thuc Tran | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-8 of 8 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2017-02-22-3 | 02/22/2017 | 02/23/2017 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2017-04-07-1 | 04/07/2017 | 04/10/2017 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2017-04-18-1 | 04/18/2017 | 04/19/2017 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2018-02-27-3 | 02/27/2018 | 02/28/2018 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2018-02-27-4 | 02/27/2018 | 02/28/2018 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2018-02-27-5 | 02/27/2018 | 02/28/2018 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2018-02-27-6 | 02/27/2018 | 02/28/2018 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2018-02-27-7 | 02/27/2018 | 02/28/2018 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods