Project Details
This page displays current information for project DEA: 081C0914.
Project Information
Project Identifiers | Project ID: 211047 DEA: 081C0914 EFIS: 0814000223 |
---|---|
DIST-CO-RTE-PM | 08-RIV-60-R12.2/22.1&26.5/30.4 |
Award Date | 03/30/2016 |
Closeout Date | 08/09/2018 |
Work Description | MILL AND OVERLAY MAINLINE PAVEMENT, SHOULDERS, RAMPS, INCLUDE DIGOUTS |
Location Description | MILL AND OVERLAY MAINLINE PAVEMENT, SHOULDERS, RAMPS, INCLUDE DIGOUTS |
QA Service Level | 1 (Verified on 06/24/2016) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
miguel.calixto@dot.ca.gov | Miguel Calixto | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-3 of 3 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2017-05-13-2 | 05/13/2017 | 05/17/2017 | Quality Control | Concrete | View |
2016-08-22-4 | 08/22/2016 | 08/26/2016 | Quality Assurance | Concrete | View |
2016-07-26-7 | 07/26/2016 | 07/26/2016 | Annual Source Testing | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods