Project Details
This page displays current information for project DEA: 11413304.
Project Information
Project Identifiers | Project ID: 210950 DEA: 11413304 EFIS: 1114000037 |
---|---|
DIST-CO-RTE-PM | 11-SD-15-R6.5/R10.9 |
Award Date | 12/29/2015 |
Closeout Date | 08/21/2018 |
Work Description | PCC REHABILITATION INCLUDING SLAB REPLACEMENT, GRINDING, CURB RAMPS. |
Location Description | IN SAN DIEGO COUNTY IN SAN DIEGOFROM 0.2 MILE SOUTH OF SAN DIEGOMISSION ROAD OC TO 0.3 MILE NORTH OF ROUTE 52/15 SEPARATION |
QA Service Level | 1 (Verified on 03/09/2016) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
arashdeep.pannu@dot.ca.gov | Arashdeep "Art" Pannu | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-3 of 3 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2016-08-29-6 | 08/29/2016 | 08/30/2016 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2016-07-20-7 | 07/20/2016 | 07/25/2016 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2016-07-20-8 | 07/20/2016 | 07/25/2016 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods