Project Details
This page displays current information for project DEA: 042G8504.
Project Information
Project Identifiers | Project ID: 210866 DEA: 042G8504 EFIS: 0412000008 |
---|---|
DIST-CO-RTE-PM | 04-ALA-580-R4.0 |
Award Date | 01/11/2016 |
Closeout Date | 12/21/2017 |
Work Description | CONSTRUCT A 600 FOOT SOLDIER PILE AND LAGGING WALL WITH GROUND ANCHOR |
Location Description | CONSTRUCT A 600 FOOT SOLDIER PILE AND LAGGING WALL WITH GROUND ANCHOR |
QA Service Level | 1 (Verified on 10/27/2015) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
mohammed.saberi@dot.ca.gov | Mohammed Saberi | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 21-21 of 21 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2016-05-26-16 | 05/26/2016 | 06/10/2016 | Verification | Concrete | View |
Go to page:
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods