Project Details
This page displays current information for project DEA: 031F4004.
Project Information
Project Identifiers | Project ID: 210862 DEA: 031F4004 EFIS: 0300020420 |
---|---|
DIST-CO-RTE-PM | 03-PLA-80-35.1/38.3 |
Award Date | 03/10/2016 |
Closeout Date | 06/19/2020 |
Work Description | WIDEN EASTBOUND ROADWAY |
Location Description | WIDEN EASTBOUND ROADWAY |
QA Service Level | 1 (Verified on 10/20/2015) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
martin.clark@dot.ca.gov | Phil Zink | Resident Engineer | Caltrans RE DB |
kenneth.haas@dot.ca.gov | Carl Anderson | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 58 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2017-08-11-8 | 08/11/2017 | 08/14/2017 | Verification | Concrete Core | View |
2017-08-11-9 | 08/11/2017 | 08/14/2017 | Verification | Concrete Core | View |
2017-08-11-10 | 08/11/2017 | 08/14/2017 | Verification | Concrete Core | View |
2016-08-24-6 | 08/24/2016 | 08/29/2016 | Quality Control | Concrete | View |
2016-08-26-1 | 08/26/2016 | 08/29/2016 | Quality Control | Concrete | View |
2016-09-21-7 | 09/21/2016 | 09/27/2016 | Quality Control | Concrete | View |
2017-01-13-2 | 01/13/2017 | 01/17/2017 | Quality Control | Concrete | View |
2016-07-08-14 | 07/08/2016 | 07/11/2016 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
2016-08-29-1 | 08/29/2016 | 08/29/2016 | Quality Assurance | SMTL TM5 - Couplers | View |
2016-08-29-2 | 08/29/2016 | 08/29/2016 | Quality Assurance | SMTL TM5 - Couplers | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods