Project Details
This page displays current information for project DEA: 080J0804.
Project Information
Project Identifiers | Project ID: 210837 DEA: 080J0804 EFIS: 0800000283 COOP: 081625 |
---|---|
DIST-CO-RTE-PM | 08-RIV-15-34.7/51.6 |
Award Date | 04/17/2017 |
Closeout Date | Not set |
Work Description | (Alternative Delivery) DESIGN-BUILD OF THE INTERSTATE 15 EXPRESS LANES PROJECT |
Location Description | Riverside County and SBD-15-0.0/1.3 |
QA Service Level | 1 (Verified on 05/08/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Roy.Fisher@parsons.com | Roy Fisher (reports) | Resident Engineer | Caltrans RE DB |
scott.bauer@dot.ca.gov | Scott Bauer | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 351-360 of 361 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2018-06-25-13 | 06/25/2018 | 06/29/2018 | Quality Assurance | Concrete | View |
2018-06-15-11 | 06/15/2018 | 06/19/2018 | Quality Assurance | Concrete | View |
2018-06-14-6 | 06/14/2018 | 06/19/2018 | Quality Assurance | Concrete | View |
2018-06-14-7 | 06/14/2018 | 06/19/2018 | Quality Assurance | Concrete | View |
2018-05-29-12 | 05/29/2018 | 06/01/2018 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
2018-05-09-7 | 05/09/2018 | 05/11/2018 | Quality Assurance | Concrete | View |
2018-04-26-1 | 04/26/2018 | 04/30/2018 | Quality Assurance | Concrete | View |
2018-03-20-4 | 03/20/2018 | 03/01/2018 | Quality Assurance | Concrete | View |
2018-03-20-5 | 03/20/2018 | 03/23/2018 | Quality Assurance | Concrete | View |
2018-03-01-3 | 03/01/2018 | 03/05/2018 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods