Project Details
This page displays current information for project DEA: 020E0904.
Project Information
Project Identifiers | Project ID: 210808 DEA: 020E0904 EFIS: 0200000016 |
---|---|
DIST-CO-RTE-PM | 02-SHA-5-R29.3/R31.1,R45.0/R45.8 |
Award Date | 02/03/2016 |
Closeout Date | 10/21/2020 |
Work Description | REPLACE BRIDGE, REALIGN ROADWAY AND SEISMIC RETROFIT |
Location Description | IN SHASTA COUNTY ABT 8 MI N OF SHASTA LAKE CTY AND NEAR LAKEHEAD FRM TURNTABLE BAY O/C TO 0.1 MI N OF O'BRIEN SRRA & FRM 0.4 MI S TO 0.3 MI N OF DOG CREEK BRIDGE. |
QA Service Level | 1 (Verified on 09/23/2015) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
nathan.alexander@dot.ca.gov | Nathan Alexander | Resident Engineer | Caltrans RE DB |
chris.brace@dot.ca.gov | Christopher S 'Chris' Brace | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 91-96 of 96 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2016-07-13-2 | 07/13/2016 | 07/15/2016 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2016-07-12-3 | 07/12/2016 | 07/13/2016 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2016-06-30-8 | 06/30/2016 | 07/01/2016 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2016-06-21-2 | 06/21/2016 | 06/22/2016 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2016-05-23-11 | 05/23/2016 | 05/26/2016 | Department Acceptance | SMTL TM5 - Couplers | View |
2016-05-10-2 | 05/10/2016 | 05/11/2016 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods