Project Details
This page displays current information for project DEA: 071193U4.
Project Information
Project Identifiers | Project ID: 210735 DEA: 071193U4 EFIS: 0713000007 |
---|---|
DIST-CO-RTE-PM | 07-LA-10-37.2/42.4 |
Award Date | 11/16/2015 |
Closeout Date | 07/11/2022 |
Work Description | CONSTRUCT HOV LANES, WIDEN BRIDGES, AND REALIGN RAMPS. |
Location Description | IN LA COUNTY FROM CITRUS STREET IN WEST COVINA TO ROUTE 57 IN POMONA |
QA Service Level | 1 (Verified on 03/07/2016) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
rodolfo.c.cao@dot.ca.gov | Rodolfo Cao | Resident Engineer | Caltrans RE DB |
thein.win@dot.ca.gov | David Win | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 81-90 of 175 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2018-03-19-15 | 03/19/2018 | 03/19/2018 | Quality Assurance | Concrete | View |
2018-03-16-2 | 03/16/2018 | 03/20/2018 | Quality Assurance | Concrete | View |
2018-03-08-4 | 03/08/2018 | 03/20/2018 | Quality Assurance | Concrete | View |
2016-07-19-27 | 07/19/2016 | 07/20/2016 | Informational | Concrete | View |
2018-02-26-3 | 02/26/2018 | 02/28/2018 | Quality Assurance | Concrete | View |
2017-02-01-10 | 02/01/2017 | 02/26/2018 | Quality Assurance | Concrete | View |
2018-02-02-24 | 02/02/2018 | 02/03/2018 | Quality Control | Concrete | View |
2018-01-31-14 | 01/31/2018 | 02/03/2018 | Quality Control | Concrete | View |
2018-01-25-5 | 01/25/2018 | 02/01/2018 | Retest | SMTL TM6 - Ductile Iron Cast Samples | View |
2018-01-19-4 | 01/19/2018 | 01/23/2018 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods