Project Details
This page displays current information for project DEA: 071193U4.
Project Information
Project Identifiers | Project ID: 210735 DEA: 071193U4 EFIS: 0713000007 |
---|---|
DIST-CO-RTE-PM | 07-LA-10-37.2/42.4 |
Award Date | 11/16/2015 |
Closeout Date | 07/11/2022 |
Work Description | CONSTRUCT HOV LANES, WIDEN BRIDGES, AND REALIGN RAMPS. |
Location Description | IN LA COUNTY FROM CITRUS STREET IN WEST COVINA TO ROUTE 57 IN POMONA |
QA Service Level | 1 (Verified on 03/07/2016) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
rodolfo.c.cao@dot.ca.gov | Rodolfo Cao | Resident Engineer | Caltrans RE DB |
thein.win@dot.ca.gov | David Win | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 101-110 of 175 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2017-06-30-7 | 06/30/2017 | 07/05/2017 | Quality Assurance | SMTL TM5 - Threaded Bar | View |
2017-06-30-1 | 06/30/2017 | 07/03/2017 | Quality Assurance | SMTL TM5 - Threaded Bar | View |
2017-06-28-9 | 06/28/2017 | 07/13/2017 | Quality Assurance | Concrete | View |
2017-06-14-8 | 06/14/2017 | Verification | Concrete | View | |
2017-06-13-3 | 06/13/2017 | Quality Assurance | SMTL TM5 - Welded Hoops | View | |
2017-05-24-4 | 05/24/2017 | 05/26/2017 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2017-05-18-5 | 05/18/2017 | 05/22/2017 | Quality Control | Concrete | View |
2017-05-17-11 | 05/17/2017 | 05/22/2017 | Quality Control | Concrete | View |
2017-05-17-10 | 05/17/2017 | 05/22/2017 | Quality Assurance | Concrete | View |
2017-05-16-5 | 05/16/2017 | 05/22/2017 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods