Project Details
This page displays current information for project DEA: 044A0904.
Project Information
Project Identifiers | Project ID: 210032 DEA: 044A0904 EFIS: 0415000178 |
---|---|
DIST-CO-RTE-PM | 04-NAP-29,101-47.0/47.2 |
Award Date | 02/23/2015 |
Closeout Date | 12/19/2017 |
Work Description | BRIDGE REPLACEMENT. |
Location Description | NAPA COUNTY ABOUT 6. MILES NORTH OF CALISTOGA AT TROUTDALE CREEK BRIDGE. |
QA Service Level | 1 (Verified on 11/05/2014) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
syd.valeh@dot.ca.gov | Syd Valeh | Resident Engineer | Caltrans RE DB |
jonathan.chi@dot.ca.gov | Jonathan Chi | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 80 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2015-06-19-6 | 06/19/2015 | 06/24/2015 | Verification | Concrete | View |
2015-06-19-7 | 06/19/2015 | 06/26/2015 | Verification | Concrete | View |
2015-06-19-8 | 06/19/2015 | 06/22/2015 | Quality Control | Aggregate | View |
2015-06-19-9 | 06/19/2015 | 06/22/2015 | Quality Control | Aggregate | View |
2015-06-19-10 | 06/19/2015 | 06/19/2015 | Quality Control | Concrete | View |
2015-06-19-11 | 06/19/2015 | 06/19/2015 | Quality Control | Concrete | View |
2015-06-19-13 | 06/19/2015 | 07/08/2015 | Verification | Concrete | View |
2015-06-19-16 | 06/19/2015 | 07/14/2015 | Verification | Concrete | View |
2015-06-23-8 | 06/23/2015 | 06/25/2015 | Informational | Concrete | View |
2015-06-26-10 | 06/26/2015 | 06/01/2015 | Informational | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods