Project Details
This page displays current information for project DEA: 04297634.
Project Information
Project Identifiers | Project ID: 209820 DEA: 04297634 EFIS: 0415000040 COOP: 042548 |
---|---|
DIST-CO-RTE-PM | 04-ALA-84,680-17.9/21 |
Award Date | 02/19/2021 |
Closeout Date | Not set |
Work Description | ROUTE 84 WIDENING (4-LANE EXPRESSWAY) FROM I-680 TO PIGEON PASS, INCLUDING INTERSECTION, DRAINAGE IMPROVEMENTS AND UTILITY RELOCATION. |
Location Description | ALAMEDA COUNTY IN AND NEAR SUNOL, PLEASANTON, AND LIVERMORE ON ROUTE 84 FROM 0.1 MILE EAST OF ROUTE 680 TO 0.1 MILE SOUTH OF RUBY HILL DRIVE AND ON ROUTE 680 FROM 1.2 MILES SOUTH TO 1.8 MILES NORTH OF ROUTE 84 |
QA Service Level | 1 (Verified on 11/04/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
paramjit.pandher@dot.ca.gov | Paramjit Pandher | Resident Engineer | Caltrans RE DB |
kristen.wu@dot.ca.gov | Kristen We | Structural Representative | Caltrans SR DB |
dylan.larose@dot.ca.gov | Dylan Larose | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 641-650 of 705 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-01-17-2 | 01/17/2022 | 01/17/2022 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2022-01-14-38 | 01/14/2022 | 01/17/2022 | Quality Control | Concrete | View |
2022-01-14-37 | 01/14/2022 | 01/14/2022 | Quality Control | Concrete | View |
2021-12-06-43 | 12/06/2021 | 12/29/2021 | Quality Assurance | Concrete | View |
2021-11-22-47 | 11/22/2021 | 12/27/2021 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
2021-11-24-27 | 11/24/2021 | 12/08/2021 | Quality Assurance | Concrete | View |
2021-11-30-44 | 11/30/2021 | 12/08/2021 | Quality Assurance | Concrete | View |
2021-11-23-31 | 11/23/2021 | 12/07/2021 | Quality Assurance | Concrete | View |
2021-11-16-38 | 11/16/2021 | 12/07/2021 | Quality Assurance | Concrete | View |
2021-11-04-61 | 11/04/2021 | 12/02/2021 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods