Project Details
This page displays current information for project DEA: 04235524.
Project Information
| Project Identifiers | Project ID: 209708 DEA: 04235524 EFIS: 0412000496 COOP: 042536,042616 |
|---|---|
| DIST-CO-RTE-PM | 04-SM-92,82-R11.2/10.5 |
| Award Date | 01/20/2017 |
| Closeout Date | 02/14/2018 |
| Work Description | IMPROVEMENTS TO THE STATE ROUTE (SR) 92/EL CAMINO REAL (SR82) INTERCHANGE |
| Location Description | IN THE CITY OF SAN MATEO |
| QA Service Level | 1 (Verified on 10/24/2016) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| douglas.inori@dot.ca.gov | Doug Inori | Resident Engineer | Caltrans RE DB |
| jordan.jarosz@dot.ca.gov | jordan jarosz | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 28 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2017-06-15-5 | 06/15/2017 | 06/16/2017 | Quality Assurance | SMTL TM5 - Headed Bars | View |
| 2017-06-30-9 | 06/30/2017 | 07/06/2017 | Quality Assurance | SMTL TM5 - Headed Bars | View |
| 2017-06-15-7 | 06/15/2017 | 07/07/2017 | Quality Control | Concrete | View |
| 2017-06-15-8 | 06/15/2017 | 07/07/2017 | Quality Control | Concrete | View |
| 2017-06-16-10 | 06/16/2017 | 07/07/2017 | Quality Control | Concrete | View |
| 2017-06-23-16 | 06/23/2017 | 07/07/2017 | Quality Control | Concrete | View |
| 2017-06-30-10 | 06/30/2017 | 07/07/2017 | Quality Control | Concrete | View |
| 2017-07-06-16 | 07/06/2017 | 08/01/2017 | Quality Assurance | Concrete | View |
| 2017-07-14-8 | 07/14/2017 | 08/01/2017 | Quality Assurance | Concrete | View |
| 2017-07-18-21 | 07/18/2017 | 08/01/2017 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
