Project Details
This page displays current information for project DEA: 08347704.
Project Information
Project Identifiers | Project ID: 209695 DEA: 08347704 EFIS: 0800000616 |
---|---|
DIST-CO-RTE-PM | 08-SBD-SR-58-0/12.9 |
Award Date | 11/10/2017 |
Closeout Date | 01/14/2021 |
Work Description | (Alternative Delivery) The CMGC project will upgrade SR 58 from 2- to 4-lanes in San Bernardino County from the Kern County line to 7.5 miles east of US-395. |
Location Description | SR-58 / 395 Kramer Junction project. In San Bernardino County from the Kern County line to 7.5 miles east of US-395. |
QA Service Level | 1 (Verified on 12/01/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
shaine.shahidi@dot.ca.gov | Shaine Shahidi | Resident Engineer | Caltrans RE DB |
osama.abdalla@dot.ca.gov | Osama Abdalla | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 371-380 of 394 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2019-08-07-26 | 08/07/2019 | 08/16/2019 | Quality Assurance | Concrete Core | View |
2019-08-26-4 | 08/26/2019 | 08/27/2019 | Quality Assurance | Concrete | View |
2019-09-16-13 | 09/16/2019 | 09/18/2019 | Quality Assurance | Concrete | View |
2020-01-09-7 | 01/09/2020 | 01/10/2020 | Quality Assurance | Concrete | View |
2020-01-09-8 | 01/09/2020 | 01/10/2020 | Quality Assurance | Concrete | View |
2020-01-10-12 | 01/10/2020 | 01/11/2020 | Quality Assurance | Concrete | View |
2020-06-04-21 | 06/04/2020 | 06/30/2020 | Quality Assurance | Concrete | View |
2018-03-09-1 | 03/09/2018 | 03/13/2018 | Quality Control | SMTL TM5 - Welded Hoops | View |
2018-02-22-2 | 02/22/2018 | 02/26/2018 | Retest | SMTL TM5 - Welded Hoops | View |
2018-06-12-8 | 06/12/2018 | 06/19/2018 | Retest | SMTL TM6 - Ductile Iron Cast Samples | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods