Project Details
This page displays current information for project DEA: 041A5514.
Project Information
Project Identifiers | Project ID: 209573 DEA: 041A5514 EFIS: 0400000496 |
---|---|
DIST-CO-RTE-PM | 04-SF-101,280-1.5/1.8,R4.1/R4.4 |
Award Date | 09/12/2014 |
Closeout Date | 01/20/2016 |
Work Description | REPLACE BARRIER RAILINGS |
Location Description | THE CITY AND COUNTY OF SAN FRANCISCO ON ROUTE 101 AND ROUTE 280 AT ROUTE 101/280 SEPARATION. |
QA Service Level | 1 (Verified on 05/12/2014) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
jose.david@dot.ca.gov | Jose David | Resident Engineer | Caltrans RE DB |
nick.tsai@dot.ca.gov | Nick Tsai | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 20 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2015-04-01-5 | 04/01/2015 | 04/03/2015 | Verification | Concrete | View |
2015-03-15-1 | 03/15/2015 | 03/18/2015 | Quality Assurance | Concrete | View |
2015-03-14-3 | 03/14/2015 | 03/18/2015 | Quality Assurance | Concrete | View |
2015-03-14-4 | 03/14/2015 | 03/18/2015 | Quality Assurance | Concrete | View |
2015-03-13-5 | 03/13/2015 | 03/18/2015 | Quality Assurance | Concrete | View |
2015-03-13-6 | 03/13/2015 | 03/18/2015 | Quality Assurance | Concrete | View |
2015-03-13-7 | 03/13/2015 | 03/18/2015 | Quality Assurance | Concrete | View |
2015-03-11-5 | 03/11/2015 | 03/18/2015 | Quality Assurance | Concrete | View |
2015-03-11-6 | 03/11/2015 | 03/18/2015 | Quality Assurance | Concrete | View |
2015-03-11-7 | 03/11/2015 | 03/18/2015 | Quality Assurance | Concrete | View |
Go to page:
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods