This page displays current information for project DEA: 04152724.
Project Information
Project Identifiers | Project ID: 209544 DEA: 04152724 EFIS: 0412000628 |
---|---|
DIST-CO-RTE-PM | 04-CC-4,242-R8.0/25.2&0.0/3.4 |
Award Date | 08/12/2014 |
Closeout Date | 12/22/2017 |
Work Description | INSTALL RAMP METERING AND TOS ELEMENTS. |
Location Description | CONTRA COSTA COUNTY AT VARIOUS LOCATIONS ON RTE 4 FROM WEST OF ALHAMBRA AVENUE TO EAST OF LOVERIDGE ROUTE D AND ON RTE 242 FROM ROUTE 680 TO ROUTE 4. |
QA Service Level | 1 (Verified on 05/20/2014) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
ranjeet.singh@dot.ca.gov | RANJEET SINGH | Resident Engineer | Caltrans RE DB |
mathew.abel@dot.ca.gov | Mathew Abel | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 25 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2015-04-27-13 | 04/27/2015 | 05/05/2015 | Verification | Concrete | View |
2015-05-04-4 | 05/04/2015 | 05/05/2015 | Verification | Concrete | View |
2015-05-14-7 | 05/14/2015 | 05/26/2015 | Quality Control | Concrete | View |
2015-05-12-8 | 05/12/2015 | 05/26/2015 | Quality Control | Concrete | View |
2015-05-06-5 | 05/06/2015 | 05/26/2015 | Quality Control | Concrete | View |
2015-05-19-5 | 05/19/2015 | 06/04/2015 | Verification | Concrete | View |
2015-05-29-3 | 05/29/2015 | 06/04/2015 | Verification | Concrete | View |
2015-06-10-2 | 06/10/2015 | 06/11/2015 | Verification | Concrete | View |
2015-06-16-5 | 06/16/2015 | 06/25/2015 | Verification | Concrete | View |
2015-06-24-16 | 06/24/2015 | 07/16/2015 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types