Project Details
This page displays current information for project DIME:209281.
Project Information
Project Identifiers | Project ID: 209281 Permit Numbers: 06136DP0786 06126MC0837 06136RT0777 |
---|---|
DIST-CO-RTE-PM | 06-TUL-99-30.4/30.4 |
Award Date | 10/09/2012 |
Closeout Date | 02/06/2015 |
Work Description | Add new asphalt Dike from the new Curb/Gutter to connect to existing AC dike at NB 99 entrance to onramp . Construct HMA (A/C) taper, approx. 200' as shown on plans. Install 2 Street Light Standards, Type 15.work on permit 0612-6MC-0837add contractor:Ry |
Location Description | 1225 Hillman St., Tulare |
QA Service Level | 1 (Verified on 01/15/2014) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
No results found. |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods